Darnestown Presbyterian Church BEAR Blog

Home » Current Architectural Drawings

Current Architectural Drawings

Phase 1 floor Plan chancel

This drawing shows the Phase One west end renovation and addition.  This includes the new entrance and narthex, gathering area, classroom, renovated bathrooms and an expanded chancel.  The offices have moved to the basement as shown in the following drawing on the left.  The basement also includes a new choir/multipurpose space and new bathrooms.  A close-up of the chancel area is shown on the right, below.  A pdf document is attached if you would like to print these images for more detailed viewing.

phase 1 floor plan basement

%d bloggers like this: